Updated On: 30 November, 2020 05:18 PM IST | Nainital | IANS
The 90-foot-long structure of bamboo, jute, and grass was built across the two-lane Kaladhungi-Nainital highway by local contractors over a period of 10 days. The cost of the bridge is Rs 2 lakh

Photo used for representational purpose
A bridge for reptiles may sound uncanny but the Uttarakhand Forest Department has built a first-of-its-kind elevated eco-bridge across a busy highway in Ramnagar forest division so that reptiles trying to cross over are not crushed under traffic.
The 90-foot-long structure of bamboo, jute, and grass was built across the two-lane Kaladhungi-Nainital highway by local contractors over a period of 10 days. The cost of the bridge is Rs 2 lakh.