Updated On: 25 August, 2024 07:50 AM IST | Mumbai | A Correspondent
This is due to the tunnelling work at Mumbai Metro 7A project, nine families shifted to hotel

The cavity opened up around 10 pm on Friday night
On Friday night, the road at P&T colony in Andheri East Sahar road witnessed a massive cave-in. This occurred due to tunnelling work of the Mumbai Metro 7A project. Nine families, who lived in the surrounding area, have been moved to a hotel.
According to the eyewitness, the cavity opened up around 10 pm on Friday. The hole in the road is around 24-feet-deep and is right outside the residential building in Mumbai. Godfrey Pimenta, a local civic activist, demanded a safety audit of the area. “Authorities should take prompt action and ensure the safety of the area. The hole should be filled up with concrete,” said Pimenta.