Updated On: 25 May, 2023 07:49 AM IST | Mumbai | Rajendra B. Aklekar
The railways will also provide 166 pumps at 24 vulnerable flooding-prone locations as part of its monsoon preparations

Keeping the services running during the monsoon is a challenge for both railways in Mumbai and lifting the tracks is one way of doing this
Besides regular monsoon preparations, about 59.8 km of tracks will be raised this year in the city to avoid flooding and waterlogging along Mumbai`s railway routes.
While 47.8 km track lifting has been planned on the Central Railway Mumbai division, about 12 km of track lifting is planned on Mumbai suburban line of Western Railway.