Updated On: 28 June, 2023 11:16 PM IST | Mumbai | mid-day online correspondent
In response to recent developments near Magathane metro station, a joint inspection was carried out by the Mumbai Metropolitan Region Development Authority (MMRDA), Maha Mumbai Metro Operation Corporation Limited (MMMOCL) and the Brihanmumbai Municipal Corporation (BMC) to ensure the uninterrupted and safe operations of the metro system.

Photo/Twitter
In response to recent developments near Magathane metro station, a joint inspection was carried out by the Mumbai Metropolitan Region Development Authority (MMRDA), Maha Mumbai Metro Operation Corporation Limited (MMMOCL) and the Brihanmumbai Municipal Corporation (BMC) to ensure the uninterrupted and safe operations of the metro system.
During the inspection, it was discovered that the stormwater drain chamber near Entry Exit 2 of Magathane station had sustained damage due to the collapse of the surrounding soil caused by excavation work conducted by a nearby builder. As a result, stormwater began flowing into the builder`s excavation area, posing a potential risk to the drain chamber as well as the foundation of the stairs and escalator.