Updated On: 18 August, 2023 08:56 PM IST | Mumbai | mid-day online correspondent
Central Railway said that it will operate mega block on its suburban sections carrying out various engineering and maintenance works on August 20

Representational Pic
Central Railway`s Mumbai Division on Friday said that it will operate a mega block on August 20.
In a statement, Central Railway said that it will operate mega block on its suburban sections carrying out various engineering and maintenance works on 20.08.2023 as under:
Matunga - Mulund up and down fast lines from 11.05 am to 3.55 pm
Down fast line services leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 am to 3.35 pm will be diverted on down slow line between Matunga and Mulund stations halting as per their respective scheduled halts and fast trains beyond Thane will be re-diverted on down fast line and will arrive destination 15 minutes behind schedule.
Up fast line services leaving Thane from 10.50 am to 3.46 pm will be diverted on Up slow line between Mulund and Matunga halting as per their scheduled halts and will be re-diverted on Up fast line and will arrive destination 15 minutes behind schedule.