Updated On: 26 April, 2024 02:58 PM IST | Mumbai | mid-day online correspondent
The installation of the 136-metre-long bow-string-arch-type girder at Worli began at 2 am and was completed by 3.25 am, said BMC.

Girder installed by BMC/ screengrab
The Brihanmumbai Municipal Corporation (BMC) has successfully installed a massive 25,000-ton girder connecting the southbound lane of Mumbai Coastal Road to the Bandra Worli Sea Link. The civic body issued a statement announcing the achievement.
The installation of the 136-metre-long bow-string-arch-type girder at Worli began at 2 am and was completed by 3.25 am. This engineering feat is the first of its sort in India, involving installation at sea, reported PTI.