Updated On: 29 September, 2022 01:57 PM IST | Mumbai | Rajendra B. Aklekar
The 132m-high bridge is being constructed by Afcons in the Mumbai-Pune Expressway Missing Link project

Missing Link Project
India’s highest cable-stayed road bridge is being constructed in Maharashtra. This 132m-high bridge is being constructed by infrastructure major Afcons in the Mumbai-Pune Expressway Missing Link project. At present, the length of the existing Mumbai Pune Expressway from Khopoli exit to Sinhgad Institute is around 19 kms.
The Missing Link Project will bypass the Khandala Ghat section and will reduce the distance of the expressway by over six kilometres reducing travel time by more than 25 minutes.